Wind power in Mexico: Vestas to supply 27 aero generators with 93 MW to Enel Green Power

Wind power in Mexico: Vestas to supply 27 aero generators with 93 MW to Enel Green Power

Warning: foreach() argument must be of type array|object, bool given in /home/mexiconow/public_html/sites/mexiconow/wp-content/themes/mexiconowwpnew/single.php on line 253

Vestas received an order to supply and install 27 aero generators for Salitrillos wind power park, located in Reynosa, Tamaulipas. The model V136-3.45 MW turbines were ordered for the construction of the 93 megawatt park by Enel Green Power Corporation. This project will use a US$120 million investment. These turbines are expected to be delivered during the third trimester of 2018, and the aero generators shall be activated in 2019.

×